Sunday, June 28, 2009

Red Hot Seats

Just when we thought we had seen the last of the dirt dobber nests I pulled out the old seat cushions. What a mess. I am going to get a quote from Beachwood Canvas to replace the cushions. The original color was red. Hopefully we will have the body back in six to eight weeks. In the meantime we need to get everything prepared for final assembly.

Tuesday, June 23, 2009

Metal Rehab


The tub and associated metal parts have been delivered to Metal Rehab. Should be ready for the next step in two or three weeks. We are anxious to get on with it.

Monday, June 22, 2009

Refinishing the Body Begins



We have decided to send the body parts to Metal Rehab to be chemically prepared prior to performing the body and paint work. They are highly recommended. Their environmentally safe process throughly strips the metal parts of paint, rust, sealers, and body filler.