Friday, January 16, 2009

$104,500 Willys

Saturday, November 29, 2008

Engine, Transmission, and Transfer Case

Engine, transmission, and transfer case in frame

Engine rebuilt

Transmission rebuilt

Transfer case rebuilt

The engine, transmission, and transfer case have been rebuilt. Next step, prepare the frame and begin putting it all back together.

Monday, November 24, 2008

Christmas Time is Near

If we receive everything on our Christmas wish list and invest some blood, sweet, and tears our Willys will soon look like the one in this photo.

Thursday, June 5, 2008

It's Been Crazy Busy

It has been a while since my last post. This is a very busy time of the year for me. In spite of that much has been accomplished on our Willys. I have the transfer case, transmission, and engine torn down. I hope to begin reassembly on the transfer case and transmission next week. The engine is at a machine shop completing a throughout inspection. I should have it back soon. I don't have a new picture of our project today, but I do have this shot of a Jeep with a top which I found interesting. I'll be back soon.

Sunday, April 13, 2008

T90 and M18 Disassembly

We worked hard today taking our transmission and transfer case apart. Gayle read the instructions while I got my hands dirty. I have yet to get the nut holding the flange on the forward output shaft off. One hundred twenty lbs of torque and 61 years of dirt and grime make it quite a challenge. Here are several links we have found to be very helpful.

Sunday, April 6, 2008

Down to the Frame

After several weeks we have done a great job taking the Jeep down to the frame. We are about to the point of having to put it all back together. It is going the take some time. The engine is on a stand and we are about to open the transfer case and transmission. The Pate Swap Meet takes place later this month at Texas Motor Speedway. We plan to check it out. Hopefully we can find a quality source for paint work.

Sunday, March 23, 2008

What Next?

We have separated the body from the frame. Next step remove the engine, transmission, and transfer box. Much of the drive train was encased in dirt which protected it from corrosion. It took quite a bit of effort to clean it off. Our plan is to continue to strip the frame down and prepare it for painting. Once the frame is prepared we can begin the process of putting it all back together. The brake and electrical system will need to be completely replaced. Things will move a little slower now that Spring Break is over.

Saturday, March 22, 2008

Spring Break Spent Stripping the Jeep



The body is off and now its a matter of digging out the drive train covered with 60 years of Texas mud and dirt dobber nests.

Sunday, March 16, 2008

Sunday, March 9, 2008

What Do You Think?

Just a few modifications. Learn more at offroaders.com.

Sunday, March 2, 2008

U-Haul Auto Transport Trailer

We have reserved a trailer. The Jeep should be in town in less than two weeks.

Monday, February 25, 2008

History of the Jeep

Here is a short pictorial history of the Jeep courtesy of Vintage Jeeps Parts.